The contents of this UP, complemented by the UP2 - Risks - Management Assurance and the UP3 Reliability-Design in the microelectronics industry, from the same toolbox, constitute a very interesting set ( operational toolbox) for a future manager of the company. (Intervener B Pomoet)
On completion of the unit, the student will be capable of: | Classification level | Priority |
---|
Percentage ratio of individual assessment | Percentage ratio of group assessment | ||||
---|---|---|---|---|---|
Written exam: | 60 | % | Project submission: | % | |
Individual oral exam: | % | Group presentation: | % | ||
Individual presentation: | % | Group practical exercise: | 40 | % | |
Individual practical exercise: | % | Group report: | % | ||
Individual report: | % | ||||
Other(s): % |
Type of teaching activity | Content, sequencing and organisation |
---|---|
Course | Methodological course on common laws of probability for reliability, specific estimation methods, notions of the Bayesian approach. |
Case studies | Case study for the application of acquired knowledge: Practical course on the estimation of a Weibull distribution boundary with an application for the life cycle of major nuclear plant components; use of “R” software programme. |
Evaluation | Case study will be carried out in groups Written exam of 1h - 1h30 at the end of the unit |