The objective of this study is for students to apply the knowledge and skills acquired in the other UPs of the Major. Students will need to deploy a network of nodes connected to a single gateway for communication to the cloud. Each node will be in charge of actuators (controllers, motors) and sensors (temperature, humidity, motion). These cyber-physical nodes will have to be fully operational in the sense of what will have been seen in the other UPs: serial and Bluetooth communications, data reliability, actuator effectiveness, energy efficiency. The gateway will have to interface properly in LoRa with an already operational computer network, which will allow the data collected to be processed and the actuators to be controlled.
On completion of the unit, the student will be capable of: | Classification level | Priority |
---|---|---|
Design and deploy an embedded physical measurement system | 7. Create | Essential |
Design and deploy an embedded control system | 7. Create | Essential |
Guarantee the reliability of the acquired data | 5. Summarise | Essential |
Connect a cyber-physical system by radio link to a communication gateway to the cloud | 7. Create | Essential |
Analyze the data received | 4. Analyse | Important |
Control connected objects through the network | 3. Apply | Important |
Evaluate and, if necessary, adjust the quality of radio transmissions | 3. Apply | Important |
Evaluate the adequacy of the computer network used to meet the needs of the project | 6. Assess | Important |
Percentage ratio of individual assessment | Percentage ratio of group assessment | ||||
---|---|---|---|---|---|
Written exam: | % | Project submission: | 100 | % | |
Individual oral exam: | % | Group presentation: | % | ||
Individual presentation: | % | Group practical exercise: | % | ||
Individual practical exercise: | % | Group report: | % | ||
Individual report: | % | ||||
Other(s): % |
Type of teaching activity | Content, sequencing and organisation |
---|---|
Course/ Practical courses | Session 1 Evaluate the adequacy of the computer network used to meet the needs of the project |
Project | Session 2 to 7 To interface and control a cyber-physical measurement and control system connected to a computer network through a radio communication gateway. |